Work

Floors that sit still.

First public job is up — a kitchen and hall in the Columbia area. Send more rooms and they go here.

Columbia area · Sept 2026

Kitchen and hall

Worn kitchen tile came up. Joists underneath were a mess. We set new lumber, then waterproof oak-look plank through the hall. Original trim stayed.

Before — stained kitchen tile, grout holding dirt.

Before

Before — stained kitchen tile, grout holding dirt.

After — waterproof plank through the hall, casings left.

After

After — waterproof plank through the hall, casings left.

Tile up. New joists going in. This is the part most bids skip.

The structure

Tile up. New joists going in. This is the part most bids skip.

Doorway tile broken out. This is where a cheap overlay fails.

What we found

Doorway tile broken out. This is where a cheap overlay fails.

Click-lock LVP, leftover boxes, expansion at the base.

On the tools

Click-lock LVP, leftover boxes, expansion at the base.

Jack, saw, and a straight joist. The finish floor sits on this.

Structure

Setting the bay

Jack, saw, and a straight joist. The finish floor sits on this.

Staggered layout, leftover boxes, plane already flat.

LVP

On the floor

Staggered layout, leftover boxes, plane already flat.

Large-format porcelain, tight grout, brass trim.

Tile

Bath floor

Large-format porcelain, tight grout, brass trim.

Tight lock, no peaking, no proud edges.

LVP

Click-lock seam

Tight lock, no peaking, no proud edges.

Request a walkthrough

Early public jobs get crew pricing.